Home > English> Proudcts>Ballast Water> Regulations> IMO regulations

The IMO Regulations

IMO regulations will not affect all ships in the same way. Ballast water treatment will be phased in, with requirements for different ships arriving at different times.

Keel laid
BW(M3)
Timeline to reach the D-2 Regulation
Before 2009
1,500¡ÜV¡Ü5,000
2015
V<1,500 or V>5,000
2017
2009-2011
V<5,000
Dilivery of Vessel
V¡Ý5,000
2017
After 2012
All Vessels
Dilivery of Vessel

Vessels built in 2009 should be in compliance with the D-2 Regulation by second annual survey,no later than 2011 (A.1005 (25)).
Requirements for vessels built in 2010 will be discussed in MEPC 59.

 

imo