Products OceanGuard® BWMS Home>products>OceanGuard® BWMS 
 
Components | cification | osion Test | stallation | bal Threat | egulations | Technology | Efficiency | Catalog |
 

The IMO Regulations

IMO regulations will not affect all ships in the same way. Ballast water treatment will be phased in, with requirements for different ships arriving at different times.

Keel laid
BW(M3)
Timeline to reach the D-2 Regulation
Before 2009
1,500V5,000 2015
V<1,500 or V>5,000 2017
2009-2011 V<5,000 Dilivery of Vessel
V5,000 2017
After 2012
All Vessels
Dilivery of Vessel
Vessels built in 2009 should be in compliance with the D-2 Regulation by second annual survey,no later than 2011 (A.1005 (25)).
Requirements for vessels built in 2010 will be discussed in MEPC 59.

D-2 Regulation

    In International Convention for the Control and Management of Ships' Ballast Water and Sediments, the following D-2 Regulation is addressed regarding management of ballast water.

 
 
    CopyRight @ Headway Technology Co., Ltd.
TEL: (+86)-532-83107818 FAX: (+86)-532-83107816E-MAIL:sales@headwaytech.com
ADD: F4,#5Building,A Area,Huite Industrial City,#177 Zhuzhou Road,Qingdao
  Service Contact us careers